16,500m2
Reinforced hot rubberized asphalt
17,000m2
High Performance
Polyurethane
Highlights
Stakeholders
Client
Aldar Properties
Main Contractor
PME
Objectives
Abu Dhabi Airports Company (ADAC) invited PME to bid for the inspection and maintenance of several ageing structures at Abu Dhabi International Airport, including Terminal 1, the dome cargo facility and the bridge structure.
Solution
Domes, façade and bridge — 17,000 m² of polyurethane with 11,000 lm of joint treatment
Roof and canopy — 16,500 m² of reinforced hot rubberised asphalt monolithic membrane with extruded polystyrene insulation
Solutions Applied
An overview of the solutions deployed for this project.
Gallery
Message from the Lead
This was one of PME's first projects as main contractor. The scope included removal of the existing waterproofing systems and full maintenance of the building envelope, covering roofs, walls and all external works. The works were planned and surveyed in advance and executed in coordination with all stakeholders, with the outcome confirmed by the client and the supervising consultants, Morganti and Parsons.