Structural Injection
50,000 m2 Tunnel Waterproofing
Highlights
Stakeholders
Client
ADAC
Consultant
ARUP
Main Contractor
CCC
Objectives
Waterproofing — system to carry a 10-year warranty
Injection — cracks identified during surface preparation; waterproofing held by the consultant until the cracks were treated
Solution
Waterproofing — 50,000 m² of fully bonded HDPE membrane to the tunnel
Injection — structural crack injection to the slab